- Pekerjaan Pemasangan Fire Hydrant di PT.TIA .
- Pekerjaan Meja Ruang Vacum & Spafil .
- Pekerjaan Ducting Supply FWH.
- Pekerjaan Gudang Rawa Udang .
- Pekerjaan Ducting Area AHU Batching.
- Pekerjaan Renovasi Liquid Tahap II.
- Pekerjaan Landscape Marketing Gallery Housing Frontage R18,Housing Frontage R19 & Housing R19.
- Addwork for Drainage System Improvement Phase II.
- Pekerjaan Pembangunan Washpad.
- Pekerjaan Demolish Wall, Floor & Door at Material Preparation.
- Project Investigation Dolphin Area.
- Addwork for Drainage Phase 2.
- Pekerjaan Renovation Full Store Room.
- Pekerjaan Landscape Berm dan Lereng Jembatan IV, Round About & Parkir Sport Club.
- Additional Work M/E (Pipe) -Sludge Drying Project.
- Pekerjaan Area Dispensing & Air Lock Wet Process.
- Pekerjaan Demolish Ceramic & Plester.
- Pekerjaan Temporary Wet Process Area.
- Pekerjaan Area MCC Process.
- Pekerjaan Civil for Mezzanine Area Wet Process.
- Pekerjaan Roof Of Machine.
- Pek New Gutter East Side of Brewhouse.
- Pekerjaan Finishing Plafond Dak Beton Area Canning 1.
- Pekerjaan Pagar BRC Area Hydrant.
- Pekerjaan Addwork Struktur & M/E Rumah Tinggal 2 Lantai Purwakarta.
- Pekerjaan Cor Lantai Area Unloading Fat dll (2014).
- Pekerjaan Ducting Return AHU.
- Pekerjaan Maintenance Landscape Area I.
- Pekerjaan Upgrading Mining Office.
- Pekerjaan Addwork Civil & M/E for Sludge Drying Project.
- Pekerjaan Repair Roof at Bay 2 Facility Repair & Maintenance.
- Pekerjaan Tambah Mess Senior Port Site.
- Pekerjaan Perbaikan Jembatan di PT. ABK.
- Pekerjaan Landscape konstruksi Housing BTD #1 dan Rumah contoh T.336 BTD #1 .
- Pekerjaan Repair Fence & Replace Ceramic, Repair Paving & Maintenance.
- Pekerjaan Additional Gutter at Temporary Waste STO Facility Repair & Maintenance.
- Pekerjaan Canopies at FST Tanks.
- Pekerjaan New Gutter East Side of Brewhouse Project.
- Pekerjaan Gyle Tank Roofstructure Incl. Lighting.
- Pekerjaan Drainage System Improvement Phase II.
- Pekerjaan Area Gwolf.
- Pekerjaan Trolley Stainless Steel-II.
- Pekerjaan Trolley Stainless Steel.
- Pekerjaan Tanam Rumput Area Depan Drier.
- Pekerjaan Bongkar dan Pasang Dinding di Area Mezzanine, Drier & Ex. Blender.
- Pekerjaan Bantu di Area Drier.
- Pekerjaan Pengecatan Pompa dan Motor.
- Pekerjaan Pipa Compressor Area Nitrogen & Spafill.
- Pek. Modifikasi Pipa & Tutup bak Pump Pit WWTP.
- Pek Sludge Drying Project-Civil & M/E Works.
- Pek. Muffler Hydrant.
- Add. Work Area Clarifier.
- Pekerjaan Tambahan Jembatan Penyeberangan di Atas Jaringan Pipa.
- Pekerjaan Renovasi Office (Mahakam Square).
- Pekerjaan Tambahan Mess Senior (Perlengkapan Mess Senior).
- Pekerjaan Canopy Mining KRA.
- Proyek Rumah Tinggal 2 lantai.
- Pek. Pipa Compressor Area G Wolf.
- Pek. Pipa Compressor Area Bin Tipper Formulatting.
- Pek. Perbaikan Talang Warehouse.
- Pek. Precast concrete drain - Rain Gutter Project.
- Pek. Kick Plate and Paint Line Works.
- Pek. Berm Akses Road, berm Jalan dan Housing #9 Cluster R12.
- Pek. Jalan Setapak Pertanian Organik.
- Pek.Cable tray & platform area mesin vacuum.
- Pek. Pipa Compressor Ruang Genset.
- Pek. Pemasangan Muffler Exhaust - Vacuum.
- Pek. Geser Kolom WF & Potong Kolom Area Office Produksi.
- Pek. Bongkar dinding Area Drier DLL.
- Pek. Tutup Lubang Jalur Pipa DLL.
- Pek. Perbaikan Area Open Yard.
- Pek. Pembongkaran Dinding Area Dismantle.
- Pek. Variasi Jendela Depan Mess Senior.
- Pek. B3 Storage & Oil Trap.
- Pek. Cat Bondex Ex Canning II Dll.
- Pek. Pengecatan Line Tabung Pemadam kebakaran Railing Pagar Pembatas & railing Tangga DLL.
- Pek. Tambah Reroute Galvanized Pipe, Power Cable and Control Cable Deep Well Existing Proyek NVDAL BSL -3 .
- Pek. Area Laboratorium.
- Pek. Penggantian Compressor, Contactor dan Pengisian Refrigrant R22 Ruang Minor.
- Pek. Add Work Cut and Fill Fish Pond Area.
- Pek. Plester Aci Pagar Keliling Area WWTP.
- Pek. Bongkar Dinding Area WH II.
- Pek. Pengadaan WF 350 DLL.
- Pek. Tambah Kurang Renovasi Area Utility.
- Pek. Partisi Temporary.
- Pek. Tambah Area Hydrant.
- Pek. CIP Kitchen Dan Tambah Office WWTP.
- Pek. Tambah Kurang Transfer Zone WH II.
- Pek. Tambah Ruang MCC.
- Pek. Hampar Batu Bulat Area Cooling Tower.
- Pek. General maintenance Mesin Compresor & Air dryer.
- Pek. Relokasi Piping Drier.
- Pek. General Maintenance Full Pipa Compressor dan Nitrogen.
- Pek. Platform & Pemindahan Mesin Vacuum.
- Pek. General Maintenance Full Compressor Positioning.
- Pek. Recondition and Repainting Existing Zincalume Roof Area.
- Pek. Atap Warehouse (Replacement of Zincalume roof at conditional WH 25 derajat C) new small WH.
- Pek. Catwalk Mooring Dolphin.
- Pek. Repair & Extend Explosive Magazine Building and Fuel Storage 510 KL.
- Pek. Geser Kolom WF Area Office Produksi.
- Pek. Ruang MCC .
- Pek. Landscape Rumah Frontage 301, Gerbang R8/9.
- Pek. Landscape. Rumah Tinggal (Personal) .
- Pek. Landscape Rumah Tahap 4A 5A.
- Pek. Berm Row 54 & Row 19 (Sisi Utara) GIIC.
- Pek.Lansekap di Main Entry Kota Deltamas.
- Pek. Test Geoteknik.
- Pek Stagging, Charger Battery and Air Lock.
- Pek. Submersible Pump.
- Pek. Chipping & Grounding Lantai Area Bay I, II, III.
- Pek. Chipping & Grounding Lantai Area UCR.
- Pek. Pembuatan outlet pipa air kotor toilet area locker room.
- Pek. Pembuatan drainase area washpad.
- Pek. Perbaikan & pembersihan talang air area Bay I,II,III & dismantle.
- Pek.Excavated Soil.
- Pek.Transfer Zone WH 2.
- Pek. Pipa Hydrant.
- Pek. Lantai di Area WWTP.
- Pek. Cor Lantai Belakang Broiler.
- Pek.Renovasi Area Utility.
- Pek. Tambah Bongkar dan lain-lain di Area Drier.
- Pekerjaan Pondasi Jembatan Timbang.
- Pek.Pembuatan Dinding Sekat Bak Kontrol Oil Trap Area Dismantle.
- Pek. Drainage System Improvement.
- Pek.Pembangunan Jembatan Penyeberangan di atas Jaringan Pipa Gas.
- Pek.Ruang Blower WWTP.
- Pek. Addwork. Bongkar Pasang Paving Block CKB Samarinda.
- Pek.Addwork Cell Slab CKB Samarinda.
- Pek.Addwork Sliding Door Repair & Drainage Pipe CKB Samarinda.
- Pek. Cement Treated base CKB samarinda.
- Pek. Maintenance Main road CKB Samarinda.
- Pek. Infrastructure Improvement area CSUL.
- Pek.Addwork Cover Grill CKB Samarinda.
- Pek. Addwork CTB Infrastructure area CSUL.
- Pek. Addwork Pembangunan Mess Senior JMB Pelebaran Kamar Tidur.
- Pek.Repair Water Gutter Power House.
- Pek.Addwork Pembangunan Mess senior PT JMB (II).
- Pek. Landscape Rumah Tahap #8 Cluster R12.
- Pek.Additional Access for Drum Filter at SHT Area L'oreal.
- Pek.Paving Block Area MBBR to EQ Tank & Permanent Access to Cross Pipe Sleeper at External Area L'oreal.
- Pek. Street Lamps L'oreal.
- Pek. Asphalt Road L'oreal.
- Pek. Greenhouse L'oreal.
- Pek. Concrette Pedestal Cable Tray & Pipe L'oreal.
- Pek.Sumpit, Pipe Racks & Concrette Table L'oreal.
- Pek. Pipe Sleeper & Spoon Drain L'oreal.
- Pek.Chipping Work at Equalizer Tank Wall L'oreal.
- Pek.DAF Platform & Steel Grating Platform SHT - L'oreal.
- Pek.Control Box & Pipe Bridge L'oreal.
- Pek.Fuel Tank Room L'oreal.
- Pek.Repairing Letter Sign for Taman Pesawat Signage Sangatta.
- Pekerjaan Penggantian Keramik Musholla.
- Pekerjaan Perbaikan dan Pengecatan Cansteen Main Road area Utility.
- Pekerjaan Pengecatan Atap dan Flashing Musholla, Toilet Locker Room dan Kantin.
- Pekerjaan Pengecatan Dinding Luar Warehouse.
- Pekerjaan Penggantian Closet dan Pemasangan Wastafel area Utility.
- Pekerjaan Perbaikan Toilet Area Utility.
- Pekerjaan Pengecatan Koridor Kantor PT Trakindo Utama Samarinda.
- Pekerjaan Perbaikan Atap Bocor dan Bubungan.
- Pekerjaan Hydrant plan for Office, Workshop and Fuel Farm.
- Pekerjaan Perbaikan dan Pengecatan Musholla.
- Pekerjaan Pengecatan Area Kantin.
- Pekerjaan Pengecatan Dinding Luar Field Service.
- Pekerjaan Perbaikan dan Pengecatan Toilet area Locker Room.
- Pekerjaan Perbaikan dan Pengecatan Toilet Bay I.
- Pekerjaan Perbaikan dan Pengecatan Tanggulan Waste Oil 2012.
- Pekerjaan Pembongkaran Tanggulan Jalan Area Bay III 2012.
- Pekerjaan Repainting Dangerous Goods Warehouse.
- Pekerjaan Perbaikan Canopy Area Ruang IT.
- Pekerjaan Repainting Water Treatment Plant (WTP).
- Pekerjaan Repainting Office Meeting PT Trakindo Utama.
- Pekerjaan Pengecatan Dinding Luar Office PT Trakindo Utama.
- Pekerjaan Perbaikan dan Pengecatan Cansteen Main Road.
- Pekerjaan Perbaikan dan Pengecatan Pos Security Depan.
- Pekerjaan Perbaikan Atap Warehouse II.
- Pekerjaan Pengecatan Bak Air untuk Dyno.
- Pekerjaan Perbaikan Manhole area Washpad CRC dan Pembuatan Tanggul Air Area Warehouse II.
- Pekerjaan Perbaikan Dinding Area Workshop Bay II-Bay III dan Lantai Keramik Rumah Genset.
- Pekerjaan Addwork Pembangunan Mess Senior PT.JMB I.
- Pekerjaan Pembangunan Mess Senior PT.JMB.
- Pekerjaan Turap Ulin Area Klenteng.
- Pekerjaan Addwork Pembangunan Rumah Dinas Kapolsek.
- Pekerjaan Perbaikan Sambungan Atap dan Talang Area Warehouse.
- Pekerjaan Temporary Office, PT. Cipta Kridatama, Rinjani.
- Pekerjaan Penambahan Teras dan Canopy Kantin.
- Pekerjaan Pembongkaran Pondasi Area Dyno Test Room.
- Pekerjaan Repainting Dinding dalam Post Security.
- Pekerjaan Repainting Ruang Service Manager dan CRC Manager.
- Pekerjaan Pengecatan Area Parkir Motor.
- Pekerjaan Perbaikan Talang Area Warehouse.
- Pekerjaan Perbaikan Talang di Area Trakindo Pergudangan.
- Pekerjaan Pengecatan Ruang Meeting PT. Trakindo Utama.
- Pekerjaan Perbaikan Toilet Post Security.
- Pekerjaan Perbaikan dan Pengecatan Cansteen, Area Parkir, dan Jalan Utama kantor.
- Pekerjaan Collector Road #6, Ruko & Parkir BTD #3, Dan Berm R16 .
- Pekerjaan Lands. Taman Bertema & Rumah T-301 R15.
- Pekerjaan Biosafety High Containment NVDAL BSL - 3.
- Pekerjaan Add Bin Wash, Utilities & Electrical.
- Pekerjaan Aspalt Pos Depan & Belakang.
- Pekerjaan Ruang Bin Washing.
- Pekerjaan Perbaikan Atap Ruang Genset.
- Pekerjaan Gudang IT.
- Pekerjaan Rak Palet Sugizindo.
- Pekerjaan Modifikasi Pipa Vacum 4 & Install Spare.
- Pekerjaan Modifikasi Vacum Line & Install Spare.
- Pekerjaan Landscape Collector Road #6, Ruko Parkir BTD #3 & Berm R16.
- Pekerjaan Landscape Pagar Panel Sisi Utara.
- Pekerjaan Landscape Kantor Polsek.
- Pekerjaan Landscape Rumah Contoh Lakeside Tipe 340.
- Pekerjaan Room Renovation For Berocca 2 GO.
- Pekerjaan Tutup Lubang Ex Blander.
- Pekerjaan Charger Forklift.
- Pekerjaan Bongkar Dinding Canning 2.
- Pekerjaan Pembuatan Gudang CIP Store + Alkohol.
- Pekerjaan Renovasi R.Janitor, Bongkar Vacum Lifter dll.
- Pekerjaan Area Keluar Masuk Karyawan.
- Pekerjaan Cor Jalan Samping Cooling Tower.
- Pekerjaan Railling Walk Way WH III.
- Pekerjaan Pasang Siku Penguat Rak WH II.
- Pekerjaan Pemipaan Tanki Kap. 3M3 Area Boiler.
- Pekerjaan Bongkar Dinding Area Canning.
- Pekerjaan Pembuatan Pondasi Kondensor di Utility.
- Pekerjaan Railling WWTP, Exhaust Fan WH III DLL.
- Pekerjaan WWTP VEOLIA L'oreal.
- Pekerjaan Landscape Rumah Sudut #1 Gerbang R15 Improvement MR STA 0.00 - 1+350.00.
- Pekerjaan Landscape Area Entrance Giant Parkir Sundial.
- Pekerjaan Landscape Berm & Housing #3C3 & #7Kavling R12.
- Pekerjaan Shower Area TPS Limbah B3.
- Pekerjaan Pemasangan Paving Block Di Area Tanki Solar.
- Pekerjaan Pemasangan Ventilator di Ruang CIP.
- Pekerjaan Tambah Pengecatan Area Drier.
- Pekerjaan Tambah Lain-lain Mushol & Utility.
- Pekerjaan Tambah Cor Lantai Kondensor.
- Pekerjaan Land Cut and Fill Preparation.
- Pekerjaan Perbaikan Rell Chain Block Compressor.
- Pekerjaan Perbaikan Pintu Transfer Box.
- Pekerjaan Exhaust Fan Lab Fisika.
- Pekerjaan Rak Sandal Toilet Locker.
- Pekerjaan Area Prior & Ruang Vitamin.
- Pekerjaan Lemari Baju Air Shower.
- Pekerjaan Meja Ruang Vitamin.
- Pekerjaan Bongkaran Dinding Cartoner & Office Lama.
- Pekerjaan Pengecatan ex Gudang Samping.
- Pekerjaan Plafond Area Cartoner.
- Pekerjaan Area Cartoner & Filling.
- Pekerjaan Pemasangan Ducting Area Vitamin.
- Pekerjaan Garis Zoning Di Area Rear Warehouse.
- Pekerjaan Perbaikan Toilet Area Workshop Bay I.
- Pekerjaan Bongkar Pasang Papan Lesplang dan Pengecatan Gedung Training Building.
- Pekerjaan Bongkar Pasang Baru Atap Transparan Clip Lock Area Workshop B1-B2 dan Atap Kantin.
- Pekerjaan CSUL Improvement Harapan Baru.
- Pekerjaan Pembangunan Campsite BDA.
- Pekerjaan Pemeliharaan & Penggantian AC Di Ruang Mayor II.
- Pekerjaan Pemeliharaan & Penggantian AC Di Ruang Mayor I.
- Pekerjaan Renovasi AC Ruang Operasi.
- Pekerjaan Finishing Ruang Produksi Ex. Office Lama.
- Pekerjaan Pembangunan Rumah Dinas Kapolsek.
- Pekerjaan Bongkar Pasang Pintu Biru di WH.4 dll.
- Pekerjaan Perbaikan Akibat Hujan Angin.
- Pekerjaan Bongkar Ducting Berikut Mesin.
- Pekerjaan Bongkar Ducting Ruang Blender.
- Pekerjaan Landscape Rumah Tahap 7, 8 dan 9 Tatar Mayangsunda R6 .
- Pekerjaan Exhaust Fan Media Preparation.
- Pekerjaan Pemasangan Ducting.
- Pekerjaan Tangga PIAB Canning-Bin Tipper.
- Pekerjaan Rak Sepatu Air Shower.
- Pekerjaan TMT-SMD-CSUL Additional Facility.
- Pekerjaan Pembuatan Dinding Pagar Keliling.
- Pekerjaan Pengecoran Lantai Kondensor.
- Pekerjaan Penyambungan Atap Mushola Baru.
- Pekerjaan Bongkar Dinding Canning & Pembersihan Pipa.
- Pekerjaan Cat Ulang Rak.
- Pekerjaan Support Pipa dan Kabel.
- Pekerjaan Area Bag Filling.
- Pekerjaan Modification Tulip Meeting Room Line#3.
- Pekerjaan Kerja Tambah Outside Dumper.
- Pekerjaan Catwalk Akses Ke Atap.
- Pekerjaan Meja Lab Panthogen (bactrac).
- Pekerjaan Tutup Outside Dumper.
- Pekerjaan Bongkar Ducting Return Formulating.
- Pekerjaan Area Bag Filling.
- Pekerjaan Perapihan dan lain-lain.
- Pekerjaan Lain-lain di WH & WWTP.
- Pekerjaan Temporary dll.
- Pekerjaan Chipping & Grouting Area Workshop Bay I & II Workshop CRC.
- Pekerjaan Perbaikan & pemasangan Down Pipe Talang Workshop CRC.
- Pekerjaan Perbaikan Dinding Rangka Roof Fan Area Warehouse.
- Pekerjaan Modifikasi Transfer Box Premix.
- Pekerjaan Pemasangan Gate Valve.
- Pekerjaan Pemeliharaan dan Penggantian AC di Ruang Minor I OK.
- Pekerjaan Pembuatan Tempat Cuci Palet.
- Pekerjaan Potong Tiang Canopy WH.1 dan WH.2.
- Pekerjaan Bongkar Dinding dll.
- Pekerjaan Tambah TMT Infrastructure Improvement Harapan Baru-Samarinda.
- Pekerjaan Pasang Flow Meter WWTP.
- Pekerjaan Pembuatan Gambar Lay Out.
- Pekerjaan Bongkaran (ex. Kantor Lama).
- Pekerjaan Penggantian Pipa & Pemasangan Pipa Formulating Drain Musholla.
- Pekerjaan Perbaikan Area Locker Wanita & Formulating.
- Pekerjaan Pemindahan Mesin Compressor, Air Dryer Air Receiver (Pekerjaan Tambah 2).
- Pekerjaan Pemindahan Tangki, Tungku Pemanas Air dan Pipa Gas Nitrogen.
- Pekerjaan Cincin Penjepit Tempat Sampah.
- Pekerjaan Ruang OB, WH I dan WH II.
- Pekerjaan Landscape Ruko & Parkir Bandoeng Tempo Doeloe (BTD) Tahap 2.
- Pekerjaan Landscape Area Main Entry Sekolah Al-Irsyad .
- Pekerjaan Renovasi Ruang Canning 1 dan Air Lock Drier.
- Pekerjaan Penambahan Pipa Blow Down dan Perbaikan Kebocoran.
- Pekerjaan Pek.Tambahan Pembuatan Turap dll di Lapangan Bola.
- Pekerjaan Cut and Fill Area Lapangan Bola.
- Pekerjaan Pekerjaan Tambah Ruangan Office Maintenance dan Produksi.
- Pekerjaan Cover Dudukan Palet & Dinding Transfer Box.
- Pekerjaan Wastefel Low & Medium Care.
- Pekerjaan Perbaikan Lantai Outside Dumper.
- Pekerjaan Tambah Pipa Air Kotor Toilet Locker.
- Pekerjaan Perbaikan lantai Stonehard & Ren. Washup.
- Pekerjaan Pembangunan Rumah Kanit, Rumah Asisten dan Rumah Staf di Camp Nangka areal PT. Bhineka Wana.
- Pekerjaan Renovasi AC di Ruang Operasi.
- Pekerjaan Saluran Pembuangan Loundry.
- Pekerjaan Instalasi Kabel & Pipa Air Washing Area.
- Pekerjaan Buat Dump Tank Capasitas 200 M3 Untuk WWTP.
- Pekerjaan Modifikasi Pos Belakang (Pekerjaan Tambah).
- Pekerjaan Ganti Sky Light Lt. 5 & Ganti Floor Hinge Pintu Office.
- Pekerjaan Bongkar Floor Hinge dan lain-lain.
- Pekerjaan Pembuatan Office Sementara di EX. QA.
- Pekerjaan Pengecatan Dinding di Belakang Boiler.
- Pekerjaan Partisi di EX. QA Untuk Temporari Office.
- Pembuatan Pedestal Compressor Baru Line#3.
- Modifikasi Rak WH.2 dan Cat Pintu.
- Renovasi Jalur Masuk ke Air Lock Process.
- Installation Cable.
- Pembangunan Grouting Area Workshop PT. TU Samarinda.
- Pemasangan Pipa Air Kotor Toilet Locker.
- Pembangunan Pos Samping dan Belakang.
- Pemindahan Tangki, Tungku Pemanas Air, dan Pipa Gas Nitrogen.
- Pembuatan Bumper Area Gas Nitrogen.
- Pembuatan Pintu Tempat Battery Gudang Depan.
- Pemasangan Mesin Compressor, Air Dryer, Air Reveiver.
- Pintu Pagar Depan Gudang Part dan Pintu Pedestrian Area Gas.
- Pemasangan Curving Lantai Selasar Office Enggineering & Production.
- Renovasi Atas Transfer Zone.
- Perbaikan Rolling Door WH-I.
- Pengecoran Lantai Bawah Kanopi Baru.
- Pemasangan Pintu Kaca di Reseptionis dan Bongkar Tangga Ex. Lab.
- Pembuatan Additional Office Space & MEP Works PT. CKB-BPN-Batakan.
- Concrete Replacement PT. Trakindo Utama-Samarinda.
- TMT Infrastructure Improvement di Harapan Baru Samarinda.
- Pengecoran Pedestal Frame AHU Line#3.
- Pembanguanan Landscape Rumah Tahap #4 Tipe 349/420 (2 Unit) dan Kavling (1 Unit) R12.
- Pemasangan Pipa Air Hujan Area Loundry.
- Pembongkaran Ruangan Loundry II.
- Pembuatan Pintu Emergency dan lain-lain.
- Pembongkaran Ducting Ruang Lab.
- Pembongkaran Area AC Control.
- Penggantian Saluran CIP.
- Pemasangan Cover Kolo Baja.
- Renovasi Ruang Canning.
- Penambahan Pintu Bongkar Muat.
- Pembuatan Area Tempat Sampah.
- Pembangunan Landscape di Showroom Cellinidi Area Kota Baru Parahyangan.
- Pembangunan Landscape Berm & Rumah Sudut T-28 4& Tahap 1E T-138 R6.
- Pembangunan Landscape Rumah Tahap 3A & 3B Tatar Larangtapa (R12).
- Site Preparation Works for Jakarta Extension Project (JEP) 2 Reduced Project.
- Pemindahan Meteran Air Bersih.
- Perbaikan Epoxy Lantai Formulating.
- Pembuatan Pintu Pagar Pos Depan.
- Pembuatan Pondasi Table Lifter.
- Pembuatan Landscape Rumah Tahap 5B-3 R6 dan Tahap 3C-2 R8/9.
- Concrete Replacement Trakindo Utama Samarinda.
- Pengecatan Clading.
- Bongkar Pasang Lemari dari NIS ke PT. Sugizindo.
- Pembangunan Ruang Klinik.
- Pembangunan Area Administrasi Gudang Depan.
- Pembuatan Rak Sepatu.
- Pemindahan Tangki, Tungku Pemanas Air, dan Pipa Gas Nitrogen.
- Bongkar Pasang Pintu Emergency & Pasang Pintu Existing.
- Pemasangan AC Station Building.
- Pengecatan Canopi WH 1.
- Pengecatan Clading Depan Office dan Ruang Istirahat.
- Pembuatan Clading Canopi WH 2.
- Penggantian Atap.
- Pembuatan Pintu Sliding Door.
- Pembuatan Horisontal Blind dan Pemotongan Meja Laboratorium.
- Pembuatan Albany Door.
- Pembuatan Tempat Cuci dan Penampungan Bak Limbah.
- Penggantian Screen Kutu Explosion Door Lt. 3.
- Recondition Project ST. III of RSUD Sangatta.
- Pengadaan Material dan Pelaksanaan Konstruksi Perbaikan Talud Jembatan.
- Pembangunan Mess Direksi PT. Batubara Duaribu Abadi.
- Pembangunan Campsite PT. Batubara Duaribu Abadi.
- Konstruksi Lantai Office Engineering Produksi.
- Penambahan Dinding Bangunan Lama dan Penambahan Jalur Cable Tray Baru.
- Pembuatan Saluran Kabel Tray dan Pelebaran Pondasi Mesin Genset.
- Peningkatan Solar Pump Station (from 100 kl to 15 kl).
- Pemasangan Pipe Line Tangki Solar.
- Pembuatan Turap Dinding Sungai dan Parit Bangunan Lab. Bahasa dan Komputer SMP Bangunan Lab. Bahasa dan Komputer SMP YPPSB.
- Pembangunan Laboratorium Komputer dan Laboratorium Bahasa SMP YPPSB.
- Construct Genset House at RSUD Sangatta.
- Supply and Install Accessories Genset at RSUD Sangatta.
- Pembuatan Saluran Kabel Tray dan Pelebaran Pondasi Mesin Genset.
- Peningkatan Solar Pump Station (from 100 kl to 15 kl).
- Rekondisi Construction of Morgue Room.
- Rekondisi Ruang UGD dan Office RSUD Sangatta.
- Pembuatan Maket Master Plan Reclamation dan Infrastructure Peternakan.
- Sewage Water Pipe Line Area STP RSUD Sangatta.
- Pembangunan Tugu (Signage) RSUD Sangatta.
- Pemasangan Mesin Compressor dan Vacuum.
- Perbaikan Lisplank Beton AB Building.
- Pembuatan Ruangan Office Maintenance dan Produksi.
- Pemasangan Mesin Pengering.
- Modifikasi Pos Security Depan.
- Pembuatan Pintu Locket Gudang Belakang.
- Pembuatan Pintu Bongkar Muat.
- Pembongkaran Ducting AC Ex. Softpack dan Pemasangan Plafon GRC WH-II.
- Pembongkaran Topi AC Bag Filling.
- Renovasi Laundry Tahap 1.
- Pembuatan Ruang Control Mixing Dumping.
- Pembuatan Ruang Retain dan Rak.
- Perbaikan Talang Air Warehouse.
- Perbaikan Dinding Sun Louvre.
- Pembuatan Sanitary Rest Room AB Building.
- Pekerjaan External.
- Renovasi Landscape Island Berm Jalan.
- Perawatan Area 1 Tahun 2010.
- Pembongkaran dan Penanaman Rumput Pekingi.
- Pembongkaran dan Transplanting Pohon Trembesi.
- Penyulaman Palem di Median Main Road.
- Pembangunan Landscape Rumah Tahap 1D dan Tahap 6.1 dan 6.2 Cluster R6.
- Renovasi Landscape Gerbang UtamaTatar Banyak Sumba.
- Renovasi Landscape Gerbang Tatar Wangsakerta.
- Penggantian Talang Air Atap Lt. 4A.
- Renovasi Lantai Keramik M1.
- Pembuatan Up Grade Roof Muster.
- Rekondisi Office dan UGD RSUD Sangatta tahap II.
- Rekondisi Office dan UGD RSUD Sangatta tahap I.
- Pengecatan Clading Depan WH.1 Bagian Timur.
- Bongkar dan Pasang Tutup Exhaust Fan di Lt. 4A.
- Pemasangan Canopi di Area Utility.
- Perbaikan/ Penggantian Talang Atap Lt. 4.
- Pengecatan Clading Drier Lt. 5.
- Pengecatan Clading Lt. 4.
- Pemasangan Pipa Gas LPG.
- Pembuatan Akses Jalan Ke Kantin.
- Pembuatan Pintu Pagar Pezuz.
- Modifikasi Pos Security Depan.
- Pembuatan As Built Drawing.
- Pengecatan Dinding Drier.
- Pembuatan Area Pembibitan Pohon Murbai.
- Pemasangan Bongkar Gudang Pos Depan.
- Pembuatan Horizontal Blind dan Kaca Film.
- Pemasangan Water Heater (Washing Room Lab.).
- Pembuatan Akses Jalan dan Pintu Locket Gudang Depan.
- Pengecatan Dinding Drier.
- Retaining Wall River Bank Sisi Jalan Pelni 71.00 M.
- Perbaikan Dinding Sun Louvre Depan Produksi.
- Bongkar Pasang Keramik CIP Store.
- Pemasangan Bentangan Sling di Atap U/ Gantungan Safety Hardness.
- Instalasi Jib Crane dan Pengadaan Bahan.
- Renovation of Executive Rest Room.
- Civil Works for Renovation The Existing Locker.
- Modification P2 Office Room Ata Tanjung Bara Supply for Material and Man Power.
- Sewage Water Pipe Line Area STP RSUD Sangata.
- Pembangunan Tugu "Signage" RSUD Sangata.
- Pemindahan Tangki Solar dan Pembangunan Rumah Genset.
- Pembangunan Laboratorium Komputer dan Bahasa SPM YPPSB.
- Pembuatan Background Huruf + Logo KPC & API Tugu "Signage" Taman Pesawat.
- Upgrade Lobby Area M1 Building.
- Bongkar dan Angkut Armco Ex. Fly Over Suwandi ke Kantor PU Kutim.
- Additional Civil Works STP RSUD.
- Pembuatan Jalan Asphal + Kerja Tambah.
- Cover Gap Beetween Roof and Wall.
- Disassembly Frame and 6 Window Locker Area for Musium IK.
- Walking Stability Room Add. Work.
- Walking Stability Room.
- Pembuatan Tangga Bin Tiper.
- Pembuatan Bumper Transfer Box Conveyor Gudang Depan.
- Pemindahan Lemari QC.
- Pembuatan Penangkal Petir WH. 1, WH. 2 & Tangki Solar.
- Pengecatan Dinding Ruang Eductor.
- Pengecatan Tangga Platform Area Drier.
- Perbaikan Lantai / Dinding dan Cat Lantai Drier Area.
- Menaikan Atap Tempat Penyimpanan Alkohol.
- Supply Tenaga Maintenance.
- Pembersihan & Pemindahan Barang di Sugizindo.
- Tenaga Maintenance.
- Perbaikan Kran, Pintu Sliding & Pemindahan Racking.
- Pengecatan Dinding No. 1, 2, 3, 4, dan 5.
- Cooling Tower Foundation See Existing.
- Pengecatan Tempat Parkir Mobil.
- Pemasangan Handle dan Stoper Magnet untuk Pintu Locker Seragam Kerja Produksi.
- Jasa Maintenance.
- Canteen Renovation + Additional Canteen.
- Pembuatan Ruang Premix, Formulating Locker Pria dan Area WWTP.
- Pembuatan Box Sparepart.
- Tambah Potong Cladding di WH 2 & Pemindahan Lampu Penerangan.
- Pemotongan Clading Atas Atap WH 2.
- Pekerjaan Mechanical & Electrical.
- Main Facilities PT. Cipta Kridatama - KBM Sanga-sanga.
- Pembuatan Shelter Operator Room STP RSUD Sangata.
- Construction of Signage Jalan Soewandi Sangata, Kutai Timur.
- Pembuatan Tangga, Talang & Rel Penggantung Safety Harnes.
- Pembangunan TUGU "Signage" Taman Pesawat Bukit Pelangi Area.
- Pembangunan TUGU "Signage" Jalan Soekarno Hatta.
- Construction of Morgue RSUD Sangata.
- Konstruksi Landscape Area Parkir Mesjid Raya, Kota Baru Parahyangan.
- Pekerjaan Damaway Sipil & ME.
- Pemasangan Pipa Supply Air Aquadest Pipa Rifeng Dia. 1/2".
- Pembuatan Box Transfer Carton, Modifikasi Pintu & System Electric.
- Pembuatan Damaway Luar.
- Pembuatan Damaway Dalam.
- Pembuatan Rangka Meja dan Bongkar Conveyor Ruang Premix.
- Alas Plat S/S Transfer Box-Conveyor Ruang Premix.
- Perapihan Dinding + Lantai & Pembuatan Meja Conveyor Ruang Premix.
- Pembuatan Area Ruang Genset.
- Perbaikan Saluran Air Hujan WH-2 dan Lain-lain.
- Bongkar Dinding Penyekat di Area Material Preparation.
- Pemasangan Atap Asbes.
- Konstruksi Landscape Berm Jalan & Kavling R6.
- Konstruksi Landscape Gerbang Utama & Berm Jalan Larangprabu Wetan R2, Berm Roundabout.
- Construction of Ward Room and Corridor Walkway RSUD Sengata.
- Pengecatan Dinding Luar Canopy.
- Tutup Bak Kontrol Korridor Locker.
- Pembuatan Ruang Office Lab Mikro.
- Perbaikan Talang yang Sudah Kropos di Gudang & Perbaikan Bak Kontrol WWTP di Depan Gudang.
- Renovasi Dinding Ruang Hot Room.
- Perbaikan Tembok dan Pengecatan Dulux Maximum Lt. 1 S/d 5 Drier.
- Additional Packaging Line.
- CSA Additional Work No. 3 : Landscaping and Drain.
- Pembuatan Water Supply, U-Ditch for Pipe Line, Paving and Surfacing, Concrete Supportor Trickling Filter.
- Additional Works Separator Wall on Aeration Tank.
- Pembuatan Infrastruktur Proyek Essence Apartment Darmawangsa.
- WWTP Project Coordination Fee for ME.
- WWTP for Civil, Structure & Architectural Works.
- Konstruksi Rangka Platform Ruang Blower.
- Pembuatan Pondasi MCC.
- Construction Tunnel (ARMCO).
- Pembangunan Ruang Genset Area Crushing Plant.
- Pembuatan Retaining Stone Foundation Wall Cluster.
- Pembuatan 2 Unit Slab Platform/Plat Injak.
- Pembuatan Retaining Wall for Foundation F-9/Turap Ulin.
- Pembangunan Ruang Genset.
- Pembuatan HO Maintenance & Keamanan RSUD Sangata Tahap I.
- Renovasi Pos Jaga Security Obvitnas M-16.
- Renovasi Pos Jaga Security Obvitnas M-16.
- Pemindahan Pompa Dust Vacuum.
- Pembuatan Pump Pit Sebanyak 6 Unit dan Pemipaan Eksternal Instalasi Pengolahan Air Limbah.
- Perawatan Lansekap Jalan Joglo Raya dan Kantor Pemasaran Perum Mega Kebon Jeruk.
- Pengecatan Dinding Luar Canopy Gudang Depan & Pemasangan Meteran Air.
- Pembuatan Pintu Emergency dan Pasang Daun Pintu.
- Pemasangan Shower Toilet Locker Pria, Pasang Cover Pipa & Pasang Kaca Film.
- Pengecatan Pintu Gerbang dan Tiang Bendera & Pemasangan Kaca Film.
- Pembobokan dan Pengecatan Dinding & Pembuatan Trolley dan Pipa Compressor.
- Perbaikan Stacking Tower Coal Handling Facilities PT. Jembayan Muarabara.
- Repair Canopy Canteen Area.
- Perbaikan Dinding Area Produksi, Locker, Pemasangan Kran dll.
- Pembuatan Pagar Pengaman Platform dan Thumbler & Pasang Wallpaper Mushola.
- Pembuatan Chemical Waste Storage & Modifikasi Emergency Door.
- Pembangunan Landscape Rumah Tahap 1E & Kav. R12, Kota Baru Parahyangan.
- Pembuatan Coal Handling Facilities di Darat.
- OBVITNAS KPC Sengata.
- Pembuatan Ruang Laboratorium, Washing Room dan Ruang Media Preparation.
- Pembuatan Landscape Depkeu Tower II.
- Pembuatan Shelter Motor Cycle.
- Renovasi Kantor PT. Chitra Paratama.
- Pembuatan Supply Pipa Jetty Ke-2 PT. Gerbang Daya Mandiri.
- Concrete Works for Jetty Loading.
- Civil Works for Unloading Facilities and Conveying System for Phase 2.
- Pembuatan Gudang IT.
- Pembuatan Landscape Show Unit Green Leaf Terrace, Kota Deltamas.
- Pembangunan Landscape Rumah Tahap 5-2A & 5-2B R 8/9 Proyek Kota Baru Parahyangan.
- Pembuatan Softscape di Area Paket 7 & 8 Mason Pine Hotel Bandung.
- Pembuatan Ruang Klinik.
- Relokasi Tangga Putar Medium Care Cartoner, Pasang Pintu Packing & Proteksi Dinding.
- Pengecatan Dinding Area Canopy Gudang Depan dll.
- Renovasi Gudang Vitamin.
- Pembuatan Jetty.
- Pembuatan Ruang Manager, Filling, dan Cartoner.
- Perbaikan Keramik yang Rusak di Ruang Laboratorium.
- Pemasangan Rel Electrik Houis untuk Drier.
- Modifikasi Sandwitch Panel As Per Drawing.
- Pembongkaran Exhaust Fan Lt. 5 dan Atap Transparan Serta Cat Welda Paint Ruang Produksi.
- Pembuatan Rubber Bumper 2 M dan Pemasangan di Ruang Rework.
- Pembuatan Pillar Hydrant 2 Nozzle.
- Pemasangan Plester Dinding Ex. Keramik.
- Penggantian Seng di Lt. 4A Luar untuk Drier.
- Pembuatan Airlock Medium Cartoner.
- Pembuatan Lemari Stainless Stell.
- Modifikasi Lemari + Railling Stainless Steel.
- Pembuatan Viewing Gallery.
- Pembuatan Plat Form Formulating.
- Pengecatan Plafond Gudang Belakang.
- Pembuatan Ruang Peralatan Cleaning Service.
- Pemasangan Pipa Springkler Gudang Depan.
- Pembuatan Airlock Medium Cartoner.
- Pembuatan Formulating.
- Penyekatan Ruang Retain untuk Ruang Lab. Micro.
- Pembuatan Corridor Locker dan Gallery.
- Pengecatan Area Filling Room.
- Perbaikan Pos Tinjau.
- Pemasangan Kawat Duri.
- Foundation for Airjet Machinen 4 Unit.
- Pembuatan Pintu Charger WH-1 dan WH-2.
- Pembuatan Canopy di Area WH-1.
- Pemindahan Laminar Air Flow dan Ruang Vitamin ke Ruang Plating.
- Pengantian Kaca Jendela Dinding Partisi Antara Process dan Drier.
- Pembuatan Airlock Canning.
- Pemasangan Closeable Drain.
- Pembuatan Area Cuci Drier.
- Renovasi Airlock Lab. Kimia Da Modifikasi Pintu dan Pembuatan Tempat Ganti Sepatu.
- Instalasi Pipa Hydrant Uk. 3" Alt-1.
- RSUD Sengata.
- Pembangunan Gedung Rekreasi di Satui Tanah Bumbu.
- Pembuatan Canopy.
- Pembuatan Tangga & Lantai Airlock Medium Cartoner.
- Pengecatan Dinding Viewing Galery.
- Perbaikan Ruang Server.
- Instalasi Genset, Grounding Genset dan Instalasi Grounding ATM.
- Modifikasi Pintu Baja & Pintu S/S.
- Pembangunan Perumahan Staff di Satui - Tanah Bumbu, South Kalimantan.
- Pembangunan Gedung Perkantoran di Satui - Tanah Bumbu, South Kalimantan.
- Konstruksi Landscape Rumah Sudut 4A, Rumah & Berm Tahap 5-1A R8/9 Da 1C & 1D R12.
- Pembuatan Fence Wire.
- Pembuatan Emergency Stairs.
- Partisi di Ruang Retain dan AC Central.
- Pembuatan Area Canning, WH dan Wet Process.
- Pembuatan Coridoor dan Sarananya.
- Pembuiatan Locket Laundry + Corridor dan Pembuatan Airlock Lab Mikro.
- Pembuatan Area Wet Process.
- Pembangunan Canopy Area WH-1 dan WH-2.
- Pembuatan Ruang Bin.
- Pembuatan Ruang Volpak.
- Pembuatan Atap Canteen dan Viewing Gallery.
- Pembuatan Ruang Formulating dan Bongkar Ruang Nucon.
- Pembuatan Airlock Medium Cartoner.
- Pembuatan Pintu Akses Forklift Gudang Belakang & Proteksi Dinidng Ruang Battery.
- Relokasi Tangga Putar, Pasang Pintu dan Proteksi Dinding Partisi.
- Pembuatan Lansekap di Boutique Shop Pasadena Blok A dan Island Pasadena.
- Pembuatan Lansekap Show Unit Malibu E/6, Kota Deltamas.
- Pembuatan Lansekap di Boutique Shop Pasadena Blok B, Kota Deltamas.
- Pembuatan Lansekap di Boulevard Club House Pasadena & Cluster Park Pasadena, Deltamas.
- Pengecatan Dinding Ruang Cartoner & Ruang Filling.
- Pembongkaran Area Viewing Gallery.
- Pengecatan Dinding Area Luar.
- Pengecatan Dinding Formulating.
- Pengecatan Dinding Security.
- Renovasi Area Locker.
- Pembuatan Zoning di Area Canning 2, Blender Packing L-2-0.
- Pembuatan Zoning Transferzone Prepare Material di WH-1 Ruang Rework, Fat Storage di WH-1-0.
- Noise Reduction in TCF Meeting Room.
- Penggantian Daun Pintu Mushola Lt.1.
- Pekerjaan di Area Wet Process.
- Pembuatan Airlock Ruang Antara dan Transfer Zone.
- Partisi Advise Store dan Penambahan di Area Bagian Filling.
- Plat Form, Plat Canopy, Ruang AC dan Ruang HPP.
- Pembuatan Airlock R Antara dan Transfer Zone.
- Pembuatan Airlock Gudang Depan.
- Penggantian Battery Forklift Formulating.
- Pembuatan Ruang Bin di Formulating.
- Pembuatan Ruang Air Lock di Gudang Depan.
- Pembuatan Area Conveyor Canning & Partisi Kaca.
- Konstruksi Landscape Hotel & Multi Fuction Room Kota Batu Parahyangan.
- Pemasangan Pipa Drainage.
- Modifikasi Filling Room Spafil 2.
- Pembuatan Ruang Vitamin.
- Perluasan Dryer Area Alternatif 2.
- Pembuatan Ventilator & Transparant Roof.
- Pembangunan Landscape Cahaya Bangsa Classical School, Kota Parahyangan.
- Pembangunan Landscape Rumah dan Berm Tahap 3 R-11 Kota Baru Parahyangan.
- Pembangunan Taman Lingkungan Cluster Bahama, Calgary dan Riviera.
- Pembuatan Bag Filling / Pembuatan Pintu dan Jendela S/S dari Kaca Laminated.
- Perbaikan & Tambah Talang Atap Dryer.
- Pembuatan Landscape di Area Komersial (Ruko Redwood) Kota Deltamas.
- Pembuatan Landscape di Area Komersial (Ruko Notre-dame) Kota Deltamas.
- Pembuatan Dumping Area (Roll Conveyor Sluice).
- Pembuatan Plafond Baru Ruang Mecah.
- Perluasan Ruang Material.
- Pembuatan Air Lock Dryer Area.
- Pembuatan Canopy Area Kantin.
- Modifikasi Filling Room Spafil dan Volpak.
- Pembuatan Ruang Batching.
- Pembuatan Toilet Locker Wanita.
- Relokasi Cat Walk Area Plafond Ruang Cartoner.
- Pembuatan Partisi Kaca di Area Nutricia Factory.
- Pembuatan Gudang Vitamin.
- Pembuatan Racking Gudang File Lantai 2.
- Pembuatan Toilet Locker Pria dan Wanita.
- Pembuatan Ruang Battery Charger Gudang Belakang.
- Pembuatan Pintu Gudang Depan dan Belakang.
- Pembuatan Ruang Battery Charger Gudang Depan.
- Relokasi Cat Walk (Area Flafond Ruang Cartoner).
- Pembuatan Workshop Baru.
- Pembuatan Gudang Vitamin.
- Pembuatan Ruang Bin Washing.
- Pembuatan Plat Form Evaporator Lantai Alumunium.
- Penggantian Battery Forklift Formulating (Alt-1).
- Perbaikan Container.
- Pembuatan Ruang Formulating.
- Bongkar Kantor Gudang Depan.
- Pembuatan Outside Dumper.
- Pembuatan Toilet Locker Pria dan Wanita.
- Pembuatan Airlock Gudang Depan / Air Lock Front Warehouse.
- Pemindahan dan Bongkar Racking / Racking Finish Good Removal.
- Ruang Bin / New Bin Storage Room.
- Pembuatan Kantor Gudang Depan (Ex. Work Shop) New Front Warehouse Office.
- Ruang Batching Baru (Ex Colby Nucond).
- Pembuatan Hardscape SD GPL KPC Sangatta.
- Pembuatan Dinding Stabilisasi Lereng Konstruksi Beton Bertulang 90 M.
- Pembuatan Dinding Partisi Mesin Dryer Area.
- Pembuatan Lansekap Riviera Cluster Gate & Park.
- Underground Sparing Cable.
- Pembuatan Lansekap Bahama Cluster Gate & Park.
- Pembuatan Landscape Calgary Cluster Gate & Park.
- Penanaman Pohon Lingkungan Cluster Pasadena.
- Pembuatan Landscape Rumah Sakit Royal Taruna.
- Konstruksi Bag Filling.
- Modification Ex Grinding Room to Wooden Bin Tip.
- Perbaikan Tiang Loading Dack-TCF Export Warehouse.
- Pemasangan Lantai dan Dinding Keramik Klinik.
- Stack Boiler Project for Material and Labour.
- Pembuatan Relay Out Cartoner Room.
- Pembuatan Ruang Supervisor.
- Perluasan Parkir Motor.
- Renovasi Lantai Musholla Tahap-2.
- Renovasi Lantai Musholla Tahap-1.
- New 2nd Floor Contruction Slab Area WH.
- Renovasi Ruko 4 Lantai di Komplek Mangga Dua Square.
- Pembangunan Sekolah Dasar GPL KPC-Sangatta.
- Pembuatan Landscape Rumah Contoh Pasadena.
- Pembuatan Landscape Berm Jalan dan Rumah Tahap 3D Tatar Jingganagara (R8/R9).
- Pembuatan Soft Landscape Project Grading, Retaining Wall Road and Drain.
- Pembuatan Interior, Mekanikal & Eksternal.
- Penanaman Pohon Palm Sadeng Kebo.
- Penanaman Rumput Gajah dan Semak.
- Pembangunan Warehouse CKD.
- Pengawasan Proyek Civil & ME di Muaralawa & Muara Tae.
- Perbaikan Dinding HPL.
- Pemasangan Keramik Area Saturator DU-2 Luas Area 11 M2.
- Pembuatan Round Duct Dust Collector Streap-Sealing Room 329.
- Rekonstruksi Retaining Wall Barat Line II.
- Rekonstruksi Retaining Wall Dump Hopper Line 1.
- Install Genset 1000 KVA.
- Pembuatan Area Rumah Sembahyang (Kelenteng).
- Pembuatan Area Underpass.
- Pemasangan Genset 1000 KVA & 500 KVA.
- Pembangunan Rumah G-2 Permanen 50 Unit.
- Konstruksi Landscape di Area Sekolah Al-Azhar, Kota Parahyangan.
- Renovasi Ruang Office, Diagnostic Room, Saluran Pembuatan Bengkel BMW.
- Relayout Washing Room.
- Pembuatan Ruang Ducting Fresh Air / Air Intake Gudang Belakang.
- Bongkar Pasang Ducting Fresh Air Gudang Belakang.
- Perbaikan Concrete Floor di Lantai 5 Process Building NYP.
- Pembuatan Kantor Foremen, Kelenteng, Pos Jaga & Pos Jaga Loading Crew.
- Repair Floor Trolley Tex Kimp for Room 867.
- Repair Floor New MC #868 & Return Duck Between Air Jet 553 - 554.
- Perawatan Landscape Area 1 Kota Delta Mas.
- Pembuatan Landscape Construction di Row 13 Package 2 di Kota Delta Mas.
- Pembuatan Landsekap Proyek Perumahan Kemang Swatama.
- Pembuatan Epoxy Lantai Ruang Administrasi Gudang Belakang Tahap-2.
- Pembuatan Epoxy Lantai Ruang Administrasi Gudang Belakang, Tahap-1.
- Pembuatan Struktur Pondasi Coal Handling Facilities, Separi Coal Mining Development Tahap-2 East Line.
- Pemasangan Batu Bronjong di Separi Coal Mining Development.
- Pembuatan Jetty di Separi Coal Mining Development.
- Pembuatan Tripot di Separi Coal Mining Development.
- Pelapisan Asphal Dilokasi Underpass, Separi Coal Mining Development.
- Pembuatan Catwalk Racking Ex. Ruang Genset.
- Pembuatan Rack System Ex. Ruang Genset.
- Konstruksi Plat Form - Pompa Colby.
- Bongkar Pondasi Genset, Pasang Dinding Bata, Urugan Pasir dan Lain-lain.
- Bongkar Pasang Genset Kav. 65 KVA, Pondasi Genset dan Lain-lain.
- Pembuatan Acessories Tangki Solar.
- Penggunaan Alat Berat di Underpass.
- Repair Floor New Location M/C. 554.
- Repair Floor New Location M/C. 753.
- Perbaikan Pintu Formulating.
- Repair Floor for New Picanol M/C # 869, Ke-2.
- Repair Floor for New Picanol M/C # 869, Ke-1.
- Perbaikan Paving Block Dekat WH TCF.
- Perbaikan Pintu-pintu di Power House.
- Pembuatan Gorong-gorong.
- Roll Out Branch Standardization Paket-X B2 Exterior Permata Bank.
- Roll Out Branch Standardization Paket-X B2 Interior Permata Bank.
- Roll Out Branch Standardization Paket-X B3 Interior Permata Bank.
- Pembuatan Cross Section Wing Wall Dump Hopper, Separi Coal Mining Development.
- Pembuatan Dinding Penahan Tanah Stock Pile, Separi Coal Mining Development.
- Pembuatan Pondasi Tangki Solar Kap. 20 M3 & 50 M3, Separi Coal Mining Development.
- Pemasangan Tangki Solar Kap. 20 M3 & 50 M3, Separi Coal Mining Development.
- Pembuatan Pump House and Water Treatment, Separi Coal Mining Development.
- Pembuatan Gardu PLN, Separi Coal Mining Development.
- Pembuatan Bor Pile Conveyor, Stacking Line, Dump Hopper dan Crushing.
- Pembuatan Pondasi MCC I & II, Separi Coal Mining Development.
- Pemasangan Cable Working - Genset Building, Separi Coal Mining Development.
- Pembuatan Tangki Solar di Separi Coal Mining Development.
- Pekerjaan Precast Pondasi Sumuran Area Under Pass, Separi Coal Mining.
- Additional Civil Work Tower Satelindo Sepinggan & Kampung Baru.
- Reflooring WH.5.
- Perbaikan Pondasi, Dinding, Cat Epoxy Washing Area & Lantai Gudang Depan.
- Pembuatan Pembatas Lantai Gudang FWH & RWH.
- Pembuatan Rabat Beton, Pagar BRC di Gudang Karplindo.
- Konstruksi Baja Knock Down at Grinding Room.
- Bongkar + Pasang Keramik Dinding Locker & Pembuatan Extension Store Keeper.
- Filling Room Rovema Expantion + Pemasangan Paving Block Gas Station Area.
- Repair Floor for New Picanol M/C.
- Core Drill Pondasi Saturator I, II Dia. 150 X 400 Mm X 12 Point.
- Partisi Antara Mesin Kaji dengan Area Weaving.
- Bongkar + Pasang Pintu Besi Formulating.
- Pembuatan Jembatan Timbang, Separi Coal Mining Development.
- Pembuatan Jalan di Lingkungan Stockpile, Separi Coal Mining Development.
- Pembuatan Under Pass, Separi Coal Mining Development.
- Pembuatan Septick Tank Guest House.
- Pembuatan Ruang Kantor dan Workshop, Separi Coal Mining Development.
- Pembuatan Panggung Railling dan Kunci.
- Bongkar/ Pasang Keramik Saturator 1 & 2 Dip. Unit 1 TCF.
- Pemasangan Genset Room, Separi Coal Mining Development.
- Pembuatan Posko Parkir, Separi Coal Mining Development.
- Rukan + Landscape.
- Civil Work Tower Motorola/ Telkomsel, Amborawang - Samboja BTS 42 M.
- Civil Work Tower Satelindo/ Indosat, Kampung Baru Ujung - Balikpapan BTS 40 M.
- Civil Work Tower Satelindo, Perum Sepinggan Baru - Balikpapan BTS 55 M.
- Pembuatan Parquite.
- Pembuatan Pagar BRC + Perbaikan Jalan Gudang Depan Nis + Ducting Exhaust Fan.
- Pekerjan Pipa Supply Air Bersih Deep Well.
- Bumper Kolom Beton Area 26 RT Baru.
- Perluasan Area Parkir Chip Truck.
- Pembuatan Struktur Pondasi Coal Handling Facilities, Separi Coal Mining Development.
- Pembuatan Platform Lokasi Workshop.
- Pembuatan Canopy Motor Sheet.
- Pembuatan Water Proofing Roof Duck Building + Roof Duck Chiller.
- Renovasi Ruang Office Produksi.
- Repair/ Replacement Rain Gutter.
- Renovasi SDN Gedung Randu Agung II.
- Bangku SDN Randu Agung.
- Pembuatan Lambrisering.
- Pembuatan Frame Besi & Pembuatan Cover Ruang Tangga.
- Pembuatan List Plafond & Lantai, Balai Sarbini.
- Pembuatan Pintu dan Kusen, Balai Sarbini.
- Fitting Out Balai Sarbini, Plaza Semanggi.
- Gedung Periska.
- Gedung SLTP YPPSB - KPC + Landscape.
- Rukan Graha Astri + Landscape.
- Chimpanse & Landscape.
- Reflooring WH4.
- Floor Repair Row 10 - 11, RT Machine No. 116 - 130 TCF.
- Orang Utan Enclosure & Landscape.
- Wanariset Samboja & Landscape.
- Dyno Test Room.
- Facility Engineer Trakindo Utama.
- Renovasi Ruko "Inti Ban", Meruya Ilir.
- Hazardous Waste Storage, Cileungsi.
- Additional Canteen Building Works Gempol Warehouse.
- Facility Engineer Trakindo Utama.
- Sterillizer Tower Foundation & Filling Room.
- Extend The Floor of Storage Tank.
- Power House TC Trakindo Utama Cileungsi.
- Demolish & Install New Roofing.
- TOPS Supermarket Cilandak.
- Ragunan Primate Center & Landscape.
- Workshop Extention & Landscape PT. Trakindo Utama.
- Trakindo Utama Facility.
- PT. Rothmans of Pall Mall Indonesia.
- The New Ice Bank Nestle Indonesia.
- Mechanical Ventilations.
- Floor Concrete - Confinent Ratu Plaza.
- Manufacturing Building.
- New Roof Production Building.
- New Computer Room PT. Trakindo Utama.
- Water Proofing Friesche Vlag.
- Renovation Office & Warehouse PT. Bitzer Indonesia.
- Engine Test PT. Trakindo Utama.
- Extention Utility Building & Concrete.
- Renovation Office Roche Incinerator.
- Renovation Office Friesche Vlag.
- Engine Test PT. Trakindo Utama.
- Maintenance AC Royal Ahold Indonesia.
- Renovation Office & Concrete Nutricia.
- TOPS Supermarket Trina.
- TOPS Supermarket Permata Hijau.
- WWTP Friesche Vlag.
- Cosmed Building & Warehouse Building.
- New Warehouse PT. Trakindo Utama.
- Renovation Stay House PT. Trakindo Utama.
- Construction of The TOPS Supermarket Semanan.
- Construction of New Control Facility in The Gold Recovery Area.
- PT. Rothmans of Pall Mall Indonesia.
- Makro Pasar Rebo Extention.
- Renovasi dan Penambahan Bangunan Kantor PT. Trakindo Utama.
- Construction of The Farmer Training Center.
- Pembangunan Gedung Perawatan Kebidanan R.S. Dirgahayu.
- Architectural and Civil Works for The New Plant Propagation Facility.
- Renovation Bank Bali.
- Medical Production Building & Landscape.
- Nestle Indonesia.
- Construction of New Motal.
- Construction of E & F House 18 Units.
- Core Shed and Workshop Executive Guest House.
- Trakindo Utama's Training Center & Landscape.
- United Tractor Ware House.
- Minor Works and Labour Supply.
- Jaringan Kabel Telkom.
- Batallyon Rai Armed Kodam VI.
- Bank Danamon Indonesia.
- Office & Workshop Facility.
- Heavy Vehicles Workshop.
- Labour Supply for Maintenance.
- E & F Renovation.
- Elementary School.
- E & F Housing.
- Heavy Equipment Warehouse.
- National Camp.
- Pioneer Camp.
- E & F House Project KPC 30 Units.
- G - House Project KPC 89 Units.
- Government Office.
- Light Vehicle Workshop.
- Gedung STO.
- Hospital and General Support Building. Structural Architectural and ME Work.
- Trakindo Utama Office and Facility.
- Conveyor Foundation Fajar Bumi Sakti Coal Mining.
- Minor Works: Renovation Guest House, Extention Workshop KPC, Lunch Room at KPC Mine Site.
- Puskemas.
- Extention and Renovation of Existing Office.
- Coal Preparation Plant.
- Junior High School.
- E & F House 40 Units.
- Top Building.
- E - House.
- Mess Hall and Barrack Pt United Tractors.
- Maintenance Facility.
- Visit President, Landscape.
- Town Site Project Concrete and Timber Structure.
- G - House Project KPC 50 Units.
- Tanggo Della Training Center KPC Timbere Concrete Structure.
- Kinder Garden Project KPC Timber Structure.
- Main KPC Club Steel Concrete and Timber Structure.
- Supervisor House KPC 150 Units.
- Senior Management House KPC 49 Units.
- Sumber Mas Plywood Messing Concrete Structure and Concrete Structure.
- Acira Megah Building Steel Structure 1960 mē and Concrete Structure 756 mē.
- Koramil Office - Kabupaten Kutai.
- Pertamina Messing Contract Structure.
- Prevab Timber Structure Housing.
- Pondok Wira II Housing.
- Pondok Wira I Housing.